VoltGate
Open Commissioning Workspace
About VoltGate

Built for Critical-Facility Commissioning Agents

Eliminating Manual PowerDB Binder Bottlenecks

Hyperscale AI data-center builds carry $50,000+/day liquidated damages for energization delays, yet commissioning agents still review 200 to 1,500-page Megger PowerDB acceptance binders by hand under strict facility NDAs that forbid cloud PDF uploads.

Deterministic Local Verification

  • Table 100.14.1 & 100.1: Instant 20 C IR temperature correction (-10 C to 110 C, solid & oil) and minimum test/MOhm checks from 250 V through 46 kV+.
  • DLRO & TTR Precision: Mixed uOhm/mOhm contact resistance normalization (>50% phase variance) and +-0.5% transformer turns-ratio tolerance.
  • 1-Click Register Exports: RFC-4180 CSVs tailored for CxAlloy, Facility Grid, and Procore punch lists.

Questions about team rollout or air-gap verification? Reach us on our Contact page.